Shield Tunneling Construction Technology and Slurry treatment technology is widely used worldwide.This technique dates back to the year of 1806. In China, shield tunneling technology originated in the 1950s.
In Shield Tunnelling or Micro-tunnelling Project, Mud Cleaning is the necessary and important construction part. Tunneling and soil drilling mud usually contains sand, clay, silt, but also suspensions of cement and bentonite.
Using piling mud and water separation treatment equipment (desanding plant ) is the best solution of Mud sludge treatment in Bored Pile Construction. Mud Treatment Solution of Bored Pile: How to process slurry of bored pile construction?
Brightway BWSP250 Separation Plant for Micro Tunneling Machine on Malaysia Site. The capacity can be up to 250 m/h. The Separation Plant Working Video was took in September, 2017. From video, we can see that the BWSP250 separation plant is