This Technical Articleis edited by Brightway Separation Plant, the Desanding Plant Manufacturerfor Bored Pile Foundation Construction in China. Useful information about Desanding Plant for Bored Pile Construction.
The main application of Trenchless construction technology of underground pipe includes pipe jacking, directional drilling and crossing technology, and large section rectangular channel tunneling technology.
Brightway BWSP250 Separation Plant for Micro Tunneling Machine on Malaysia Site. The capacity can be up to 250 m/h. The Separation Plant Working Video was took in September, 2017. From video, we can see that the BWSP250 separation plant is
Brightway 180 m3/h Separation Plant for Herrenknecht Micro Tunneling Machine on Qatar Site . The Separation Plant Working Video was took in January, 2017. In October, 2016.
BWSP-150 Slurry Separation Plant is the customized mud water separator for matching with the MTS800 Pipe-jacking Machine. The capacity is up to 150m3/h ( 600GPM ).